Within the actual planning process on the deepening of the Outer Ems measurements of ship-induced waves and currents at 3 location were conducted and analyzed.

Date

09.2009 - 12.2009

Measurement Requirements

Independent Measuring Systems Sampling Rate: 20 Hz Measuring Period: 8 weeks Data Transfer via UMTS Data Storage with chronological Synchronism

Work done

Planning and installation of instruments measuring waves and currents Operation of 3 measuring locations Documentation and data analysis Analysis of results Expert report