impact monitoring for wave activity on harbor constructions on Helgoland island

About this project

For further planning the wave impact in the southern harbour of Helgoland has to be measured. There two wave gauges have been installed.

Date

01/2010 – 01/2011

Measurement Requirements

  • Independent Measuring Systems
  • Sampling Rate: 20 Hz
  • Measuring Period: 1 Year
  • Video Camera
  • Data Transfer via UMTS
  • Data Storage with chronological Synchronism
Work done

  • Planning and installation of instruments
  • Operation of 2 measuring locations
  • Documentation and data analysis
  • Analysis of results
  • Expert report
Category
AWG IV